Sodding
How to properly install sod.
Finish grade all dirt areas and remove existing weeds.
How to grade your yard.
Proper site preparation.
![Finish Grade](http://cleancutproperty.com/wp-content/uploads/2012/11/Sod-1024x682.jpg)
Once your soil is prepped, you can start laying your sod.
![Sod Rolls](http://cleancutproperty.com/wp-content/uploads/2012/11/Sod-Rolls-1024x682.jpg)
Start rolling the sod in a straight line.
Continue rolling each line parallel to the last.
Use a hard rake to pull the sod lines together.
![Sod Roller](http://cleancutproperty.com/wp-content/uploads/2013/07/Install-Sod-1024x682.jpg)
Cut your sod to fit.
![Lay Sod and Cut In](http://cleancutproperty.com/wp-content/uploads/2013/07/Lay-Sod-and-Cut-In-1024x682.jpg)
Finish laying and cutting your sod.
Use sod stakes as necessary to hold sod on hills.
![Finished Project](http://cleancutproperty.com/wp-content/uploads/2013/07/Finished-Project-1024x682.jpg)
Roll the finished project with a small compact roller to make a solid dirt to sod connection.
![Sod Roller](http://cleancutproperty.com/wp-content/uploads/2013/07/Sod-Roller-1024x682.jpg)
Water your finished project.